PREPARATION
- Ideally use water at temperature less than 65 Deg. C for performance test.
- Actual mechanical seal and bearing shall be used.
- The leakage rate of used mechanical seal shall be within acceptable range of ISO 21049 and/or API 682.
- The operating parameter of oil lubrication such as temperature, viscosity and pressure are expected within the recommended values in the Vendor operating instruction.
- Don't miss to prelubricate the bearing prior to testing stage.
- Ensure the tightness of all joints connection and any leaking shall be arrested.
- All warning, protective and control devices shall be checked and adjusted as required.
TESTING
- Test data including head, flowrate, power, bearing temperatures and vibration ( at least five points ) shall be recorded at different condition : Shutoff, minimum continous stable flow, midway between minimum & rated flow, rated flow and max. allowable flow ( as minimum 120% BEP).
- Test point at rated flow shall be within a tolerance band of +/- 5% of rated flow.
- The speed during test shall be within 3% of specified speed in pump data sheet.
- Test data shall include test curves and a summary of test performance data compared to guarantee points.
- If adjustment such as reduction in impeller diameter of single stage pump requires and it is less than 5%, so no retest required. However, any disassembly of mutli stage pump it call of retest.
- Final performance test shall be run after the correction is made.
- Additional test that can be performed are NPSHR test, Complete unit test, sound level test, Auxiliary equipment test, Bearing housing resonance test and Mechnical run test for 4 hours.
PERFORMANCE TEST TOLERANCES |
No comments:
Post a Comment